Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0356 # 08 Y:2003 | 08 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $39,566 | $55,100 | n/a |
AS0356 # 09 Y:2003 | 09 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,865 | $10,800 | n/a |
AS0356 # 10 Y:2003 | 10 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $957 | $4,260 | Not Implemented |
AS0356 # 11 Y:2003 | 11 | 2003 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,280 | $17,100 | Implemented |
AS0356 # 12 Y:2003 | 12 | 2003 | CLEAR AND RENT EXISTING SPACE | $96,000 | $8,340 | Implemented |
LE0161 # 01 Y:2003 | 01 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $585 | $0 | Not Implemented |
LE0161 # 02 Y:2003 | 02 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,365 | $3,000 | Implemented |
LE0161 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,357 | $700 | Not Implemented |
LE0161 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $17,796 | $6,000 | Implemented |
LE0161 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,814 | $0 | Implemented |
WI0446 # 01 Y:2003 | 01 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,491 | $40,000 | Implemented |
WI0446 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,813 | $15,675 | n/a |
WI0446 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,528 | $500 | Implemented |
WI0446 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,093 | $1,359 | Implemented |
WI0446 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $1,214 | $3,500 | Not Implemented |
WI0446 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $945 | $740 | Implemented |
WI0446 # 07 Y:2003 | 07 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $452 | $400 | Not Implemented |
SD0326 # 01 Y:2003 | 01 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,623 | $0 | Not Implemented |
SD0326 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,397 | $4,000 | Implemented |
SD0326 # 03 Y:2003 | 03 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,861 | $20,000 | Not Implemented |
SD0326 # 04 Y:2003 | 04 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $14,893 | $7,700 | Not Implemented |
SD0326 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,795 | $384 | Not Implemented |
SD0326 # 06 Y:2003 | 06 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,905 | $7,000 | Not Implemented |
SD0326 # 07 Y:2003 | 07 | 2003 | USE PHOTOCELL CONTROLS | $4,846 | $6,000 | Not Implemented |
SD0326 # 08 Y:2003 | 08 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $2,034 | $500 | Not Implemented |