IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0858 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,454 $63,252 Not Implemented
OK0858 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,717 $66,757 Not Implemented
OK0858 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $6,565 $3,020 Not Implemented
OK0858 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,791 $1,220 Not Implemented
MZ0111 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $460 $0 Not Implemented
MZ0111 # 02 Y:2013 02 2013 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $1,032 $2,500 Not Implemented
MZ0111 # 03 Y:2013 03 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $283 $680 Implemented
MZ0111 # 04 Y:2013 04 2013 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $514 $80 Not Implemented
MZ0111 # 05 Y:2013 05 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,873 $900 Implemented
MA0705 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,642 $200 Not Implemented
MA0705 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,284 $19,400 Implemented
MA0705 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,053 $2,800 Implemented
MA0705 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,037 $8,350 Not Implemented
MA0705 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $3,939 $13,700 Implemented
MA0705 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,632 $4,231 Not Implemented
MA0705 # 07 Y:2013 07 2013 PAY UTILITY BILLS ON TIME $1,191 $500 Implemented
MA0705 # 08 Y:2013 08 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $244 $497 Not Implemented
DL0104 # 07 Y:2013 07 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,800 $100 Not Implemented
DL0104 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,300 $9,570 Not Implemented
DL0104 # 09 Y:2013 09 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $30,500 $700 Not Implemented
DL0104 # 10 Y:2013 10 2013 MINIMIZE WATER USAGE $5,100 $280 Not Implemented
DL0104 # 11 Y:2013 11 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $48,100 $50,000 Not Implemented
DL0104 # 12 Y:2013 12 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,500 $31,050 Not Implemented
DL0104 # 13 Y:2013 13 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,200 $3,800 Not Implemented
DL0104 # 14 Y:2013 14 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,700 $1,320 Not Implemented