IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0235 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $3,534 $9,920 Not Implemented
AM0797 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $17,410 $34,210 Implemented
AM0797 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,400 $2,000 Implemented
AM0797 # 03 Y:2020 03 2020 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $20,000 Implemented
AM0797 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,799 $400 Implemented
AM0797 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $5,725 $420 Implemented
AM0797 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,280 $22,200 Implemented
AM0797 # 07 Y:2020 07 2020 USE SYNTHETIC LUBRICANT $5,500 $200 Implemented
AM0797 # 08 Y:2020 08 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $860 $60 Implemented
AM0797 # 09 Y:2020 09 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $725 $730 Implemented
BS0134 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $12,790 Not Implemented
BS0134 # 02 Y:2020 02 2020 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,687 $7,120 Not Implemented
BS0134 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,704 $1,017 Not Implemented
BS0134 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $1,507 $3,280 Not Implemented
BS0134 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $405 Not Implemented
BS0134 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $760 $1,471 Not Implemented
GT0940 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,860 $300 Not Implemented
GT0940 # 02 Y:2020 02 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $956 $250 Not Implemented
GT0940 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,480 $3,500 Not Implemented
GT0940 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,602 $1,267 Not Implemented
GT0940 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,838 $36,630 Implemented
GT0940 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $83,791 $569,779 Not Implemented
OR0733 # 01 Y:2020 01 2020 Install Anaerobic Digester $30,707 $224,950 Not Implemented
OR0733 # 02 Y:2020 02 2020 USE OPTIMUM TEMPERATURE $3,294 $5,000 Implemented
OR0733 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $1,400 $4,362 Not Implemented