Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0235 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $3,534 | $9,920 | Not Implemented |
AM0797 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $17,410 | $34,210 | Implemented |
AM0797 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,400 | $2,000 | Implemented |
AM0797 # 03 Y:2020 | 03 | 2020 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,500 | $20,000 | Implemented |
AM0797 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,799 | $400 | Implemented |
AM0797 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $5,725 | $420 | Implemented |
AM0797 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,280 | $22,200 | Implemented |
AM0797 # 07 Y:2020 | 07 | 2020 | USE SYNTHETIC LUBRICANT | $5,500 | $200 | Implemented |
AM0797 # 08 Y:2020 | 08 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $860 | $60 | Implemented |
AM0797 # 09 Y:2020 | 09 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $725 | $730 | Implemented |
BS0134 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,955 | $12,790 | Not Implemented |
BS0134 # 02 Y:2020 | 02 | 2020 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,687 | $7,120 | Not Implemented |
BS0134 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,704 | $1,017 | Not Implemented |
BS0134 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,507 | $3,280 | Not Implemented |
BS0134 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $405 | Not Implemented |
BS0134 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $760 | $1,471 | Not Implemented |
GT0940 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,860 | $300 | Not Implemented |
GT0940 # 02 Y:2020 | 02 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $956 | $250 | Not Implemented |
GT0940 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,480 | $3,500 | Not Implemented |
GT0940 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,602 | $1,267 | Not Implemented |
GT0940 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,838 | $36,630 | Implemented |
GT0940 # 06 Y:2020 | 06 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,791 | $569,779 | Not Implemented |
OR0733 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $30,707 | $224,950 | Not Implemented |
OR0733 # 02 Y:2020 | 02 | 2020 | USE OPTIMUM TEMPERATURE | $3,294 | $5,000 | Implemented |
OR0733 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $1,400 | $4,362 | Not Implemented |