IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0104 # 15 Y:2013 15 2013 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $18,800 $45,000 Not Implemented
DL0104 # 16 Y:2013 16 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,505 $10,700 Not Implemented
DL0104 # 17 Y:2013 17 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,800 $37,400 Not Implemented
DL0104 # 18 Y:2013 18 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,900 $45,000 Not Implemented
DL0104 # 19 Y:2013 19 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $19,700 $100 Not Implemented
SD0472 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $7,834 $3,850 Implemented
SD0472 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,979 $900 Implemented
SD0472 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $4,079 $11,220 Implemented
SD0472 # 04 Y:2013 04 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,650 $3,900 Implemented
SD0472 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $952 $2,197 Implemented
SD0472 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $568 $200 Implemented
DL0104 # 01 Y:2013 01 2013 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $31,000 $510 Not Implemented
DL0104 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,500 $780 Not Implemented
DL0104 # 03 Y:2013 03 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $39,500 $1,000 Not Implemented
DL0104 # 04 Y:2013 04 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,300 $100 Not Implemented
DL0104 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,600 $100 Not Implemented
DL0104 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,500 $100 Not Implemented
TT0107 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,191 $3,000 Implemented
TT0107 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,667 $6,750 Implemented
TT0107 # 03 Y:2013 03 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,733 $150,860 Not Implemented
MZ0119 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,963 $0 Implemented
MZ0119 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,154 $14,260 Implemented
MZ0119 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,150 $900 Implemented
MZ0119 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,728 $0 Not Implemented
SU0344 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,901 $0 Implemented