IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
NAICS 3333 Commercial and Service Industry Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0651 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,830 $2,314 Implemented
WV0651 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $846 $228 Implemented
WV0651 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $430 $217 Implemented
WV0651 # 11 Y:2023 11 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $140 $656 Implemented
WV0651 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,789 $14,056 Implemented
UU0208 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $4,445 $12,840 Implemented
UU0208 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,476 $127,045 Implemented
UU0208 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $230 $107 Implemented
UU0208 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,292 $7,290 Implemented
DL0208 # 12 Y:2022 12 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $436 $2,500 Implemented
DL0208 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,567 $71 Implemented
DL0208 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,331 $2,230 Implemented
DL0208 # 07 Y:2022 07 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $23,194 $11,933 Implemented
DL0208 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $583 $0 Implemented
DL0208 # 10 Y:2022 10 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,982 $55,000 Implemented
DL0208 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $33,570 Implemented
LE0527 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,527 $500,000 Implemented
LE0527 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,805 $0 Implemented
LE0527 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,621 $1,330 Implemented
LE0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $3,435 Implemented
LE0527 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,154 $160,000 Implemented
WM0168 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,941 $0 Implemented
WM0168 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $642 $1,890 Implemented
WM0168 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,833 $15,082 Implemented
WM0168 # 10 Y:2021 10 2021 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $199 $750 Implemented