IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0495 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $0 Implemented
CO0495 # 03 Y:2001 03 2001 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $470 $500 Implemented
CO0495 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,860 $500 Implemented
CO0495 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,590 $17,000 Implemented
CO0495 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,900 $1,000 Implemented
GT0720 # 01 Y:2001 01 2001 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $337 $1,000 Implemented
GT0720 # 09 Y:2001 09 2001 $93,750 $1,700 Not Implemented
GT0720 # 08 Y:2001 08 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,740 $0 Not Implemented
GT0720 # 07 Y:2001 07 2001 REDUCE EXCESSIVE BOILER BLOWDOWN $1,320 $50 Implemented
GT0720 # 06 Y:2001 06 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $658 $982 Not Implemented
GT0720 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $277 $324 Implemented
GT0720 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,472 $6,151 Implemented
GT0720 # 03 Y:2001 03 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $467 $943 Not Implemented
GT0720 # 02 Y:2001 02 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,475 $600 Implemented
LE0117 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,452 $2,500 Implemented
LE0117 # 04 Y:2001 04 2001 REPAIR OR REPLACE STEAM TRAPS $644 $1,300 Implemented
LE0117 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $5,335 $1,700 Not Implemented
LE0117 # 02 Y:2001 02 2001 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $1,140 $300 Implemented
LE0117 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $221 $100 Implemented
MA0491 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $600 Not Implemented
MA0491 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $410 $85 Implemented
MA0491 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $500 $150 Implemented
MA0491 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $800 $100 Implemented
MA0491 # 02 Y:2001 02 2001 COVER OPEN TANKS $2,300 $0 Not Implemented
MA0491 # 01 Y:2001 01 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $20,600 $10,000 Implemented