IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0598 # 02 Y:2020 02 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $28,134 $48,344 Not Implemented
WV0598 # 03 Y:2020 03 2020 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $8,920 $11,220 Not Implemented
WV0598 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $7,292 $6,768 Implemented
WV0598 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $1,467 $3,170 Implemented
WV0598 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $916 $1,021 Implemented
WV0598 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $564 $613 Implemented
WV0598 # 01 Y:2020 01 2020 INSTALL SENSORS TO DETECT DEFECTS $30,600 $10,470 Not Implemented
NL0047 # 01 Y:2020 01 2020 MINIMIZE WATER USAGE $75,018 $1,383 Not Implemented
NL0047 # 02 Y:2020 02 2020 METER WASTE WATER $41,210 $15,000 Implemented
NL0047 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $643 $1,700 Implemented
NL0047 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $1,148 Implemented
NL0047 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,600 $6,024 Implemented
NL0047 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,234 $230 Implemented
NL0047 # 05 Y:2020 05 2020 RECOVER AND REUSE WASTE MATERIAL $925 $5,160 Not Implemented
GT0943 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $27,227 $225,984 Not Implemented
GT0943 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $736 $1,938 Implemented
GT0943 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,306 $3,500 Implemented
GT0943 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $350 Not Implemented
GT0943 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,323 $2,678 Implemented
GT0943 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,005 $563 Implemented
UD1012 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,380 $400 Not Implemented
UD1012 # 06 Y:2020 06 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $67,773 $0 Implemented
UD1012 # 07 Y:2020 07 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $49,540 $21,295 Implemented
UD1012 # 10 Y:2020 10 2020 OPTIMIZE PLANT POWER FACTOR $145,150 $100,000 Not Implemented
UD1012 # 11 Y:2020 11 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $86,219 $9,464 Not Implemented