IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

172

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0844 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,477 $114,525 Implemented
AM0844 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,263 $3,900 Implemented
AM0844 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,138 $331 Implemented
AM0844 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $854 $625 Implemented
NL0055 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $252 $1,000 Implemented
NL0055 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,975 $4,500 Implemented
NL0055 # 05 Y:2021 05 2021 IMPROVE HANDLING PRACTICES $3,600 $1,600 Implemented
NL0055 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,616 $121,800 Implemented
NL0055 # 04 Y:2021 04 2021 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $3,858 $146 Implemented
MI0360 # 01 Y:2019 01 2019 USE SOLAR HEAT TO HEAT WATER $36,147 $40,234 Implemented
MI0360 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $751 $211 Implemented
MI0360 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $5,613 $13,630 Implemented
MI0360 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $9,735 $3,600 Implemented
MI0360 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,707 $3,634 Implemented
MI0360 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $3,023 Implemented
MI0360 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,445 $1,980 Implemented
MI0360 # 08 Y:2019 08 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,675 $3,764 Implemented
MI0360 # 11 Y:2019 11 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $476 $868 Implemented
SU0471 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $1,240 Implemented
SU0471 # 06 Y:2018 06 2018 INSULATE FEEDWATER TANK $75 $172 Implemented
SU0471 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,625 Implemented
MA0788 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $4,116 $10,462 Implemented
MA0788 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,644 $110,000 Implemented
MA0788 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,627 $17,006 Implemented
MA0788 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $3,493 $1,750 Implemented