IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 211 Cigarettes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0299 # 14 Y:2016 14 2016 INSTALL REPLACEMENT DOORS $55 $480 Implemented
MI0299 # 13 Y:2016 13 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $213 $352 Implemented
MI0299 # 12 Y:2016 12 2016 INSTALL OCCUPANCY SENSORS $570 $795 Implemented
MI0299 # 11 Y:2016 11 2016 USE PHOTOCELL CONTROLS $776 $480 Implemented
MI0299 # 03 Y:2016 03 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,688 $320 Implemented
MI0299 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,678 $27,288 Implemented
MI0299 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,417 $650 Implemented
MI0299 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,054 $9,821 Implemented
MI0299 # 10 Y:2016 10 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,162 $1,885 Implemented
NC0552 # 14 Y:2015 14 2015 DEVELOP A REPAIR/REPLACE POLICY $20,285 $42,560 Implemented
NC0552 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,081 $320 Implemented
NC0552 # 12 Y:2015 12 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $165,594 $3,000 Implemented
NC0552 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,528 $150 Implemented
NC0552 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,030 $1,000 Implemented
NC0471 # 09 Y:2012 09 2012 REPAIR OR REPLACE STEAM TRAPS $19,533 $16,000 Implemented
NC0471 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,793 $243,606 Implemented
NC0471 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90,894 $148,184 Implemented
NC0471 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,310 $2,810 Implemented
NC0471 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $17,141 $6,600 Implemented
NC0471 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,566 $100 Implemented
NC0471 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,568 $2,700 Implemented
NC0471 # 08 Y:2012 08 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $22,095 $21,000 Implemented
MI0137 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $901 $3,400 Implemented
MI0137 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,436 $1,074 Implemented
MI0137 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,902 $30 Implemented