Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0132 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,531 $10,336 Not Implemented
UA0132 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,339 $50 Implemented
UA0132 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $4,189 $1,583 Implemented
UA0132 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,414 $0 Not Implemented
UA0132 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $1,522 Implemented
UA0132 # 06 Y:2014 06 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,554 $6,336 Not Implemented
UA0132 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,943 $13,395 Not Implemented
UA0132 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,665 $10,900 Not Implemented
UD0915 # 07 Y:2014 07 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $993 $2,575 Not Implemented
UD0915 # 05 Y:2014 05 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,180 $700 Not Implemented
UD0915 # 06 Y:2014 06 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,210 $23,600 Not Implemented
UD0915 # 03 Y:2014 03 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,714 $1,800 Implemented
UD0915 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,815 $100 Implemented
UD0915 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,262 $0 Implemented
UD0915 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,184 $1,200 Implemented
UD0915 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129,321 $377,745 Not Implemented
UD0915 # 10 Y:2014 10 2014 ADD AREA LIGHTING SWITCHES $117 $0 Not Implemented
UD0915 # 08 Y:2014 08 2014 COVER OPEN TANKS $14,519 $39,186 Not Implemented
UD0915 # 11 Y:2014 11 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,301 $0 Not Implemented
TT0146 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $1,943 $822 Implemented
WM0057 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $7,640 Not Implemented
WM0057 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $7,175 Not Implemented
WM0057 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,633 $10,068 Not Implemented
TT0146 # 02 Y:2014 02 2014 INSTALL SKYLIGHTS $2,012 $14,000 Not Implemented
WM0057 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,391 $35,000 Not Implemented