Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,445
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8396 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,412 | $31,808 | n/a |
LT8396 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $2,360 | n/a |
LT8396 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,479 | $1,067 | n/a |
KS2427 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $69,076 | $156,917 | n/a |
KS2427 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,928 | $156,644 | n/a |
KS2427 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,498 | $453,376 | n/a |
KS2427 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM THICKNESS INSULATION | $9,550 | $6,688 | n/a |
KS2427 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,324 | $5,480 | n/a |
KS2427 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,216 | $90 | n/a |
WV0657 # 01 Y:2024 | 01 | 2024 | REPLACE BOILER | $38,907 | $149,240 | n/a |
WV0657 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $486 | $242 | n/a |
WV0657 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,266 | $1,107 | n/a |
WV0657 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,019 | $3,647 | n/a |
WV0657 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,406 | $98,076 | n/a |
WV0657 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,181 | $1,063 | n/a |
WV0657 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $2,493 | $1,302 | n/a |
WV0657 # 04 Y:2024 | 04 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $5,370 | $18,750 | n/a |
WV0657 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,482 | $1,500 | n/a |
WV0657 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,429 | $6,850 | n/a |
WV0656 # 13 Y:2023 | 13 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,364 | $3,507 | n/a |
WV0656 # 14 Y:2023 | 14 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,191 | $1,070 | n/a |
WV0656 # 02 Y:2023 | 02 | 2023 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $17,471 | $75,000 | n/a |
WV0656 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $8,319 | $1,861 | n/a |
WV0656 # 12 Y:2023 | 12 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,376 | $1,500 | n/a |
WV0656 # 09 Y:2023 | 09 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,669 | $13,005 | n/a |