IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0384 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,257 $23,650 Not Implemented
AS0073 # 02 Y:1992 02 1992 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,610 $9,350 Implemented
AS0073 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,226 $5,173 Implemented
AS0072 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,399 $42,903 Not Implemented
AS0072 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,357 $6,496 Not Implemented
AS0072 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $12,667 $11,960 Not Implemented
AS0072 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,155 $14,207 Not Implemented
AS0072 # 09 Y:1992 09 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,161 $10,760 Not Implemented
MA0256 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $480 $530 Implemented
MA0256 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $637 $1,661 Not Implemented
MA0256 # 04 Y:1992 04 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $840 $647 Not Implemented
AS0072 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,429 $20,000 Not Implemented
AS0072 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $100 Not Implemented
MA0256 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $0 Not Implemented
MA0256 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $290 $90 Implemented
MA0256 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $5,818 $10,368 Not Implemented
MA0256 # 01 Y:1992 01 1992 REPAIR OR REPLACE STEAM TRAPS $5,378 $1 Implemented
AS0072 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,491 $291 Not Implemented
AS0072 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,653 $342 Not Implemented
MA0256 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $4,995 $4,022 Implemented
AS0072 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,586 $0 Not Implemented
UD0384 # 04 Y:1992 04 1992 INSTALL TIMERS AND/OR THERMOSTATS $2,400 $800 Not Implemented
UD0384 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $31,568 $41,000 Not Implemented
UD0384 # 03 Y:1992 03 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $11,343 $3,000 Implemented
UD0384 # 02 Y:1992 02 1992 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $15,864 $22,000 Not Implemented