IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0050 # 02 Y:1985 02 1985 INSTALL STORM WINDOWS AND DOORS $1,558 $1,600 Implemented
MA0050 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $55 Implemented
LT0028 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,628 $120 Implemented
LT0028 # 03 Y:1985 03 1985 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,165 $0 Implemented
LT0028 # 02 Y:1985 02 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,990 $0 Implemented
MA0046 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $74 Implemented
KU0181 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN WATER LINES AND VALVES $178 $100 Implemented
KU0181 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $891 $150 Implemented
KU0181 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,446 $600 Implemented
KU0181 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $2,813 $750 Implemented
CO0047 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $956 $150 Implemented
CO0047 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $414 $1,200 Implemented
KU0181 # 01 Y:1985 01 1985 INSULATE BARE EQUIPMENT $10,210 $1,200 Implemented
LT0028 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $116 $150 Implemented
MA0042 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,464 $200 Implemented
LT0038 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,890 $350 Implemented
LT0038 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $944 $100 Implemented
LT0038 # 04 Y:1985 04 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,144 $1,900 Implemented
MA0042 # 03 Y:1985 03 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $326 $280 Implemented
ST0041 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,854 $7,389 Implemented
ST0041 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $917 $104 Implemented
ST0041 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $343 $0 Implemented
MA0042 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,060 $24,450 Implemented
MA0042 # 04 Y:1985 04 1985 OPTIMIZE PLANT POWER FACTOR $9,522 $13,420 Implemented
MA0042 # 06 Y:1985 06 1985 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,886 $0 Implemented