Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
186
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0198 # 02 Y:2001 | 02 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $33,540 | $3,025 | Not Implemented |
MS0198 # 01 Y:2001 | 01 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $51,081 | $50,126 | Implemented |
MS0198 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,123 | $120 | Implemented |
MS0198 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $502 | $161 | Implemented |
SU0109 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,244 | $0 | Not Implemented |
SU0109 # 06 Y:2001 | 06 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $982 | $0 | Not Implemented |
SU0109 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $662 | Implemented |
SU0109 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $28 | $0 | Implemented |
SU0109 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $1,123 | $213 | Implemented |
SU0109 # 05 Y:2001 | 05 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,828 | $30 | Implemented |
NC0226 # 01 Y:2001 | 01 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $10,828 | $12,834 | Not Implemented |
NC0226 # 02 Y:2001 | 02 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,348 | $500 | Not Implemented |
NC0226 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $2,071 | $407 | Not Implemented |
NC0226 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $279 | $150 | Not Implemented |
NC0226 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $1,122 | $2,225 | Not Implemented |
NC0226 # 08 Y:2001 | 08 | 2001 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $93,403 | $-312,000 | Not Implemented |
NC0226 # 07 Y:2001 | 07 | 2001 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $23,668 | $26,000 | Not Implemented |
NC0226 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,800 | $400 | Not Implemented |
BD0197 # 01 Y:2001 | 01 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $3,885 | $3,000 | Not Implemented |
BD0197 # 06 Y:2001 | 06 | 2001 | $418 | $0 | Implemented | |
BD0197 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,659 | $5,000 | Implemented |
BD0197 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,104 | $600 | Implemented |
BD0197 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $229 | $157 | Implemented |
BD0197 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $144 | $450 | Implemented |
MI0022 # 01 Y:2001 | 01 | 2001 | METER WASTE WATER | $2,560 | $3,650 | Not Implemented |