IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1013 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,211 $116,226 n/a
CM1013 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $465 $260 n/a
CM1013 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,342 $3,480 n/a
CM1013 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $3,590 n/a
AS0538 # 02 Y:2022 02 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $290,625 $126,000 Not Implemented
AS0538 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,438 $3,603 Not Implemented
AS0538 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $99,703 $442,407 Not Implemented
AS0538 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $3,648 $8,619 Not Implemented
AS0538 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $170,279 $17,076 Not Implemented
AS0538 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $722,230 $2,223,000 Not Implemented
MI0413 # 01 Y:2022 01 2022 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $7,040 $10,116 Not Implemented
MI0413 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $580 Implemented
MI0413 # 07 Y:2022 07 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $897 $2,750 Not Implemented
MI0413 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $5,249 Implemented
MI0413 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $1,980 Implemented
MI0413 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,023 $0 Implemented
MI0413 # 05 Y:2022 05 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,089 $5,264 Implemented
MI0413 # 08 Y:2022 08 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $755 $645 Implemented
MI0413 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $355 $140 Implemented
MZ0331 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,985 $29,286 Implemented
MZ0331 # 06 Y:2022 06 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $31,613 $98,280 Implemented
MZ0331 # 03 Y:2022 03 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $91,773 $9,040 Implemented
MZ0331 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,162 $25,757 Implemented
MZ0331 # 05 Y:2022 05 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $402,938 $1,820,000 Not Implemented
MZ0331 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,037 $46,350 Implemented