Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0233 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,400 | $1,660 | Implemented |
MI0233 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,084 | $80 | Implemented |
MI0233 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $5,193 | $800 | Implemented |
MI0233 # 12 Y:2012 | 12 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,056 | $843 | Implemented |
MI0233 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,430 | $2,665 | Implemented |
MI0233 # 02 Y:2012 | 02 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $150,126 | $80 | Implemented |
MI0233 # 01 Y:2012 | 01 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $246,388 | $33,021 | Implemented |
MI0233 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,631 | $2,050 | Implemented |
UD0870 # 11 Y:2012 | 11 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,788 | $3,000 | Implemented |
UD0870 # 07 Y:2012 | 07 | 2012 | USE MINIMUM STEAM OPERATING PRESSURE | $7,517 | $0 | Implemented |
UD0870 # 06 Y:2012 | 06 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $10,454 | $1,800 | Implemented |
UD0870 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,199 | $1,500 | Implemented |
UD0870 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,610 | $1,500 | Implemented |
UD0870 # 01 Y:2012 | 01 | 2012 | USE PHOTOCELL CONTROLS | $1,385 | $1,660 | Implemented |
UD0870 # 02 Y:2012 | 02 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $5,228 | $10,000 | Implemented |
UD0870 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $1,512 | $0 | Implemented |
SU0327 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $2,247 | $4,271 | Implemented |
SU0327 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $870 | $858 | Implemented |
SU0327 # 01 Y:2012 | 01 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $728 | $0 | Implemented |
MI0230 # 03 Y:2012 | 03 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $88,716 | $46,097 | Implemented |
MI0230 # 12 Y:2012 | 12 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,487 | $2,848 | Implemented |
MI0230 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,962 | $1,589 | Implemented |
MI0230 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,512 | $1,040 | Implemented |
MI0230 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,707 | $1,660 | Implemented |
MI0230 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,101 | $41,600 | Implemented |