IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 72 Personal Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0551 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,726 $1,000 Implemented
WV0551 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,421 $14,500 Implemented
WV0551 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,417 $1,346 Implemented
WV0551 # 11 Y:2017 11 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $33 Implemented
WV0551 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $866 $595 Implemented
WV0551 # 08 Y:2017 08 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $447 $1,000 Implemented
IA0529 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $373 $1,155 Implemented
IA0529 # 06 Y:2015 06 2015 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $1,950 $5,000 Implemented
IA0529 # 05 Y:2015 05 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $569 $210 Implemented
IA0529 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $214 $284 Implemented
IA0529 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,154 $7,444 Implemented
IA0529 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,348 $21,947 Implemented
MA0730 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $478 $300 Implemented
MA0730 # 03 Y:2014 03 2014 REDUCE VENTILATION AIR $1,607 $4,600 Implemented
MA0730 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,618 $4,285 Implemented
DL0117 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $23,476 $5,870 Implemented
DL0117 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,922 $5,695 Implemented
SF0376 # 04 Y:2009 04 2009 AVOID FROST FORMATION ON EVAPORATORS $2,865 $9,600 Implemented
SF0376 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,155 $110,307 Implemented
SF0376 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $397 $535 Implemented
SF0376 # 05 Y:2009 05 2009 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,149 $75,000 Implemented
SF0376 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $2,011 $6,725 Implemented
DL0022 # 01 Y:2008 01 2008 OPERATE BOILERS ON HIGH FIRE SETTING $10,038 $0 Implemented
DL0022 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,858 $1,000 Implemented
DL0022 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,452 $38,199 Implemented