IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 80 Health Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORC004 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $710 $1,200 Implemented
IC0268 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,827 $7,200 Implemented
IC0268 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $315 $1,040 Implemented
IC0268 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $591 $1,330 Implemented
IC0267 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,543 $7,600 Implemented
AS0522 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,984 $54,180 Implemented
AS0522 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $21,588 $279,240 Implemented
AS0522 # 03 Y:2022 03 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $11,084 $17,430 Implemented
AS0522 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $516 $200 Implemented
AS0522 # 05 Y:2022 05 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $473 $52 Implemented
UU0198 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,182 $17,630 Implemented
UU0198 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,018 $4,500 Implemented
UU0198 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,828 $12,000 Implemented
UU0198 # 02 Y:2022 02 2022 REPLACE BOILER $7,758 $4,499 Implemented
UU0198 # 01 Y:2022 01 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $13,222 $12,000 Implemented
MI0340 # 06 Y:2018 06 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,618 $12,938 Implemented
MI0340 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,892 $24,640 Implemented
MI0340 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,630 $44,639 Implemented
UA0166 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,753 $1,050 Implemented
UA0166 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,666 $38,071 Implemented
UA0166 # 02 Y:2016 02 2016 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $25,491 $80 Implemented
UA0166 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,248 $80 Implemented
UA0166 # 05 Y:2016 05 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,707 $120 Implemented
UA0166 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $617 $200 Implemented
IA0545 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $231 $292 Implemented