IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0173 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,924 $880 Implemented
UA0173 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,905 $500 Not Implemented
UA0173 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,474 $5,695 Implemented
UA0173 # 06 Y:2017 06 2017 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,206 $1,000 Not Implemented
UA0173 # 07 Y:2017 07 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $21,010 $28,800 Not Implemented
UA0173 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,811 $150 Implemented
UA0161 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $140 $34 Implemented
UA0161 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $328 $719 Implemented
UA0161 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $632 $100 Implemented
UA0161 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,411 $8,838 Implemented
UA0154 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $175 $120 Not Implemented
UA0154 # 05 Y:2016 05 2016 USE PHOTOCELL CONTROLS $414 $664 Not Implemented
UA0154 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $566 $2,045 Not Implemented
UA0154 # 03 Y:2016 03 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $201 $508 Not Implemented
UA0154 # 02 Y:2016 02 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,116 $1,660 Not Implemented
UA0154 # 01 Y:2016 01 2016 MODIFY STARTUP/SHUTDOWN TIMES $3,959 $0 Not Implemented
TT0163 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,380 $1,075 Implemented
TT0163 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,742 $5,000 Not Implemented
TT0163 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $4,100 $4,110 Implemented
TT0163 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $75 Implemented
TT0163 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $423 $1,500 Implemented
TT0163 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,532 $3,013 Implemented
TT0163 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $3,000 Implemented
UA0140 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,524 $10,992 Not Implemented
UA0140 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $54,259 $61,169 Not Implemented