IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0298 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,377 $17,617 Implemented
MS0298 # 03 Y:2006 03 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,854 $1,700 Not Implemented
MS0298 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,964 $236 Implemented
MS0298 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,852 $2,775 Implemented
MS0298 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,739 $1,313 Implemented
MS0298 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,600 $53,730 Implemented
UF0381 # 11 Y:2006 11 2006 INSTALL EQUIPMENT TO MOVE PRODUCT $29,000 $8,480 Not Implemented
UF0381 # 10 Y:2006 10 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,495 $8,880 Implemented
UF0381 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,919 $0 Implemented
UF0381 # 08 Y:2006 08 2006 ELIMINATE A BY-PRODUCT $278 $32 Implemented
UF0381 # 07 Y:2006 07 2006 UPGRADE OBSOLETE EQUIPMENT $21,240 $43,000 Implemented
UF0381 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $721 $0 Not Implemented
UF0381 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,966 $334 Implemented
UF0381 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,069 $5,892 Not Implemented
UF0381 # 03 Y:2006 03 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,105 $4,018 Not Implemented
UF0381 # 02 Y:2006 02 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,916 $715 Implemented
UF0381 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,568 $0 Not Implemented
UF0379 # 06 Y:2006 06 2006 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,041 $44,500 Implemented
UF0379 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,792 $517 Implemented
UF0379 # 04 Y:2006 04 2006 ISOLATE HOT OR COLD EQUIPMENT $8,414 $1,095 Implemented
UF0379 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,948 $8,787 Not Implemented
UF0379 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,705 $0 Not Implemented
UF0379 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $519 $0 Implemented