IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0055 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $14,550 $5,020 Not Implemented
UA0055 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $3,444 $1,970 Not Implemented
UA0055 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $640 Not Implemented
UA0055 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,014 $1,500 Implemented
UA0055 # 08 Y:2010 08 2010 USE PHOTOCELL CONTROLS $983 $354 Not Implemented
UA0055 # 09 Y:2010 09 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $341 $106 Not Implemented
UA0055 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $559 $387 Not Implemented
UA0055 # 11 Y:2010 11 2010 DISCONNECT BALLASTS $123 $80 Implemented
UA0055 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $114 $250 Not Implemented
UA0054 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,442 $1,000 Not Implemented
UA0054 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,010 $7,000 Implemented
UA0054 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,265 $71,625 Not Implemented
UA0054 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $2,443 $1,893 Not Implemented
UA0054 # 05 Y:2010 05 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $42,638 $40,400 Not Implemented
UA0054 # 06 Y:2010 06 2010 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $25,338 $6,850 Not Implemented
UA0054 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $4,372 $3,230 Implemented
UA0053 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,526 $53,770 Not Implemented
UA0053 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,266 $13,725 Not Implemented
UA0053 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,400 $1,080 Not Implemented
UA0053 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $218 $177 Implemented
UA0053 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $351 $906 Implemented
UA0053 # 06 Y:2010 06 2010 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,505 $1,000 Implemented
UA0053 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $12,870 $26,550 Not Implemented
UA0053 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,306 $7,045 Not Implemented
UA0053 # 09 Y:2010 09 2010 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,920 $8,875 Not Implemented