Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0770 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,297 | $0 | Implemented |
OK0770 # 07 Y:2008 | 07 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,527 | $0 | Implemented |
OK0770 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,597 | $0 | Implemented |
OK0770 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $669 | $1,056 | Implemented |
OK0770 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,686 | $17,885 | Implemented |
OK0770 # 06 Y:2008 | 06 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,894 | $1,346 | Not Implemented |
OK0770 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,014 | $5,534 | Not Implemented |
TT0030 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $99,250 | $272,800 | Not Implemented |
TT0030 # 03 Y:2008 | 03 | 2008 | OPTIMIZE PLANT POWER FACTOR | $4,100 | $22,600 | Not Implemented |
TT0030 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,650 | $2,900 | Not Implemented |
LL0304 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $59,266 | $14,840 | Implemented |
LL0304 # 05 Y:2008 | 05 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,456 | $825 | Not Implemented |
LL0304 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,714 | $30 | Not Implemented |
LL0304 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $9,892 | $1,118 | Not Implemented |
LL0304 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $101 | $70 | Implemented |
LL0304 # 06 Y:2008 | 06 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $823 | $1,246 | Not Implemented |
LL0304 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,876 | $20,949 | Not Implemented |
LL0301 # 02 Y:2008 | 02 | 2008 | INSULATE BARE EQUIPMENT | $86,230 | $9,006 | Implemented |
LL0301 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $11,367 | $11,696 | Implemented |
LL0301 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,117 | $2,720 | Implemented |
LL0301 # 08 Y:2008 | 08 | 2008 | USE PHOTOCELL CONTROLS | $363 | $150 | Implemented |
LL0301 # 06 Y:2008 | 06 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $746 | $1,246 | Not Implemented |
LL0301 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,156 | $840 | Implemented |
LL0301 # 05 Y:2008 | 05 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,436 | $1,650 | Not Implemented |
LL0301 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $230,177 | $13,140 | Implemented |