Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0182 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,400 | $500 | Not Implemented |
UA0182 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,680 | $3,125 | Implemented |
UA0182 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,749 | $2,465 | Implemented |
UA0182 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,371 | $5,551 | Not Implemented |
UA0182 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,380 | $8,066 | Implemented |
UA0182 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $32,696 | $2,784 | Implemented |
UA0182 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $113,456 | $170,734 | Not Implemented |
UA0182 # 09 Y:2017 | 09 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,563 | $4,224 | Implemented |
UA0182 # 08 Y:2017 | 08 | 2017 | HEAT WATER WITH EXHAUST HEAT | $10,960 | $97,000 | Not Implemented |
TT0193 # 04 Y:2017 | 04 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $5,162 | $360 | Not Implemented |
TT0193 # 09 Y:2017 | 09 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $464 | $2,000 | Implemented |
TT0193 # 08 Y:2017 | 08 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $949 | $125 | Implemented |
TT0193 # 07 Y:2017 | 07 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,978 | $4,283 | Not Implemented |
TT0193 # 06 Y:2017 | 06 | 2017 | INSTALL COMMON HEADER ON COMPRESSORS | $3,186 | $8,600 | Not Implemented |
TT0193 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,550 | $3,000 | Implemented |
TT0193 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,088 | $22,470 | Not Implemented |
TT0193 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,374 | $32,000 | Implemented |
TT0193 # 01 Y:2017 | 01 | 2017 | INSULATE BARE EQUIPMENT | $35,857 | $10,000 | Implemented |
TT0192 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $175,487 | $344,898 | Implemented |
TT0192 # 08 Y:2017 | 08 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,741 | $8,000 | Not Implemented |
TT0192 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,001 | $3,000 | Not Implemented |
TT0192 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,000 | $20,000 | Not Implemented |
TT0192 # 05 Y:2017 | 05 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,432 | $9,000 | Not Implemented |
TT0192 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,492 | $11,000 | Not Implemented |
TT0192 # 03 Y:2017 | 03 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $7,986 | $5,250 | Not Implemented |