IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0448 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,478 $3,870 Not Implemented
AS0448 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $479 $56 Not Implemented
AS0443 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $27,764 $4,325 Implemented
AS0443 # 02 Y:2017 02 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $716 $675 Not Implemented
AS0443 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,407 $2,838 Implemented
AS0443 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,821 $140 Implemented
AS0435 # 06 Y:2017 06 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $780 $325 Not Implemented
AS0435 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $787 $60 Not Implemented
AS0435 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $912 $2,243 Not Implemented
AS0435 # 03 Y:2017 03 2017 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,510 $60 Not Implemented
AS0435 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,087 $5,774 Not Implemented
AS0435 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,295 $200 Not Implemented
AS0356 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,155 $30,070 Implemented
AS0356 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $939 $68 Implemented
AS0356 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $4,122 $10,296 n/a
AS0356 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,479 $100 Implemented
AS0356 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $20 Implemented
AS0356 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $697 $675 Not Implemented
AS0356 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43 $87 Implemented
AS0356 # 08 Y:2003 08 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $39,566 $55,100 n/a
AS0356 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,865 $10,800 n/a
AS0356 # 10 Y:2003 10 2003 AIR CONDITION ONLY SPACE NECESSARY $957 $4,260 Not Implemented
AS0356 # 11 Y:2003 11 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,280 $17,100 Implemented
AS0356 # 12 Y:2003 12 2003 $96,000 $8,340 Implemented