IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0226 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $251 $75 Implemented
AS0226 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,554 $60 Implemented
AS0226 # 07 Y:1998 07 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,126 $620 Implemented
AS0226 # 09 Y:1998 09 1998 $1,827 $625 Implemented
AS0226 # 10 Y:1998 10 1998 $760 $60 Implemented
AS0130 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $567 $250 Implemented
AS0130 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,494 $2,571 Implemented
AS0097 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $180 Implemented
AS0097 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $800 Implemented
AS0097 # 04 Y:1993 04 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $61,773 $50,500 Implemented
AS0067 # 09 Y:1992 09 1992 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,518 $5,000 Implemented
AS0067 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $793 $6,684 Implemented
AS0067 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,648 $6,290 Implemented
AS0067 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,425 $82,095 Implemented
AS0067 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $1,008 Implemented
AS0067 # 05 Y:1992 05 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $264,625 $2,031,000 Implemented
AS0067 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $264 $280 Implemented
AS0067 # 07 Y:1992 07 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,838 $7,000 Implemented
AS0067 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,956 $19,000 Implemented
AS0021 # 09 Y:1991 09 1991 IMPROVE LUBRICATION PRACTICES $7,796 $0 Implemented
AS0021 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,879 $0 Implemented
AS0021 # 04 Y:1991 04 1991 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $12,913 $35,000 Implemented
AS0021 # 05 Y:1991 05 1991 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $90,586 $400,000 Implemented
AS0021 # 06 Y:1991 06 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,386 $18,000 Implemented
AS0021 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,885 $1,000 Implemented