IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0462 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,497 $2,116 Not Implemented
AS0445 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,548 $4,394 Not Implemented
AS0445 # 03 Y:2017 03 2017 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $813 $675 Not Implemented
AS0445 # 02 Y:2017 02 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,708 $12,650 Not Implemented
AS0442 # 02 Y:2017 02 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,847 $5,691 Not Implemented
AS0442 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $25,870 $7,794 Not Implemented
AS0442 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,680 $720 Not Implemented
AS0440 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,622 $15,120 Not Implemented
AS0440 # 04 Y:2017 04 2017 REDUCE FLUID FLOW RATES $892 $920 Not Implemented
AS0440 # 03 Y:2017 03 2017 USE GRAVITY FEEDS WHEREVER POSSIBLE $8,594 $13,600 Not Implemented
AS0440 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,136 $100 Not Implemented
AS0440 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $500 Not Implemented
AS0417 # 03 Y:2006 03 2006 $9,586 $200 Not Implemented
AS0417 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $7,797 Not Implemented
AS0417 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,247 $10,000 Not Implemented
AS0417 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT WATER $346 $2,800 Not Implemented
AS0417 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,690 $1,000 Not Implemented
AS0417 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $452 $300 Not Implemented
AS0417 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $20,720 $27,407 Not Implemented
AS0417 # 02 Y:2006 02 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,507 $12,000 Not Implemented
AS0417 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $4,692 $10,000 Not Implemented
AS0322 # 07 Y:2002 07 2002 MINIMIZE WATER USAGE $775 $60 n/a
AS0322 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $346 $1,200 n/a
AS0322 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,056 $3,042 n/a
AS0322 # 08 Y:2002 08 2002 $77,282 $10,792 n/a