Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0503 # 04 Y:2010 | 04 | 2010 | INSTALL SKYLIGHTS | $7,467 | $22,980 | Implemented |
SD0503 # 03 Y:2010 | 03 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $24,981 | $0 | Implemented |
SD0503 # 02 Y:2010 | 02 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $28,203 | $56,758 | Implemented |
SD0503 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,987 | $2,250 | Implemented |
SF0390 # 09 Y:2010 | 09 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $261 | Not Implemented |
SF0390 # 17 Y:2010 | 17 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,167 | $17,310 | Not Implemented |
SF0390 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $4,611 | $2,176 | Not Implemented |
SF0390 # 07 Y:2010 | 07 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,024 | $5,560 | Implemented |
SF0390 # 06 Y:2010 | 06 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,991 | $789 | Implemented |
SF0390 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $24,404 | $7,250 | Implemented |
SF0390 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,023 | $1,764 | Implemented |
SF0390 # 03 Y:2010 | 03 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $14,706 | $3,207 | Implemented |
SF0390 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,828 | $0 | Implemented |
SF0390 # 01 Y:2010 | 01 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,708 | $0 | Implemented |
SF0390 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $996 | $821 | Not Implemented |
SF0390 # 15 Y:2010 | 15 | 2010 | USE PHOTOCELL CONTROLS | $1,030 | $2,587 | Implemented |
SF0390 # 16 Y:2010 | 16 | 2010 | INSTALL OCCUPANCY SENSORS | $2,946 | $75 | Not Implemented |
SF0390 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,039 | $2,749 | Implemented |
SF0390 # 13 Y:2010 | 13 | 2010 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $39,251 | $58,106 | Implemented |
SF0390 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $846 | $1,500 | Not Implemented |
SF0390 # 12 Y:2010 | 12 | 2010 | USE COMPRESSOR AIR FILTERS | $2,168 | $3,000 | Implemented |
SF0390 # 18 Y:2010 | 18 | 2010 | OPTIMIZE PLANT POWER FACTOR | $5,696 | $21,908 | Implemented |
SD0426 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,485 | $54,987 | Implemented |
SD0426 # 05 Y:2010 | 05 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,414 | $59,920 | Not Implemented |
SD0426 # 03 Y:2010 | 03 | 2010 | INSTALL SKYLIGHTS | $10,372 | $7,660 | Not Implemented |