IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0492 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $3,880 $1,527 Implemented
SD0492 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,731 $4,350 Implemented
SD0492 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $881 $1,791 Implemented
SD0492 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $531 $400 Implemented
SF0441 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $27,444 $0 Implemented
SF0441 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $651 $420 Implemented
SF0441 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,725 $23,868 Not Implemented
SF0441 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $1,679 $3,085 Not Implemented
SF0441 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $46,828 $377,867 Not Implemented
SD0439 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,054 $100 Not Implemented
SD0439 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $700 Not Implemented
SD0439 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $5,375 Not Implemented
SD0439 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,851 $8,326 Not Implemented
SD0439 # 05 Y:2011 05 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,990 $185,200 Not Implemented
SD0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $163,156 $302,600 Not Implemented
SD0438 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $300 Implemented
SD0438 # 02 Y:2011 02 2011 COVER OPEN TANKS $36,210 $16,850 Not Implemented
SD0438 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,445 $1,530 Not Implemented
SD0438 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,654 $53,450 Not Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SD0438 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $8,562 $25,530 Not Implemented
SF0397 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,161 $0 Implemented
SF0397 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,394 $0 Implemented
SF0397 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,482 $1,759 Not Implemented
SF0397 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,301 $9,456 Not Implemented