IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 3345 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0504 # 02 Y:2017 02 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,259 $2,279 Not Implemented
SF0504 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,032 $100 Implemented
SF0504 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,736 $7,335 Implemented
SF0504 # 04 Y:2017 04 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $74,348 $373,319 Not Implemented
SD0524 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,814 $18,199 Not Implemented
SD0524 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,124 $7,975 Implemented
SD0524 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,433 $30,898 Not Implemented
SD0524 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,569 $4,000 Not Implemented
SD0524 # 02 Y:2016 02 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $69,647 $181,800 Not Implemented
SD0524 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $116,648 $532,759 Not Implemented
SD0524 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,363 $800 Not Implemented
SD0524 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,754 $1,310 Implemented
SD0524 # 09 Y:2016 09 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,073 $5,877 Not Implemented
SD0524 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $954 $2,390 Not Implemented
SF0441 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $651 $420 Implemented
SF0441 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $27,444 $0 Implemented
SF0441 # 04 Y:2013 04 2013 COMBINE UTILITY METERS $1,679 $3,085 Not Implemented
SF0441 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $46,828 $377,867 Not Implemented
SF0441 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $5,725 $23,868 Not Implemented
SD0439 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,054 $100 Not Implemented
SD0439 # 05 Y:2011 05 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,990 $185,200 Not Implemented
SD0439 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $700 Not Implemented
SD0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $163,156 $302,600 Not Implemented
SD0439 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,851 $8,326 Not Implemented
SD0439 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $5,375 Not Implemented