IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0244 # 14 Y:2002 14 2002 OPTIMIZE PLANT POWER FACTOR $2,389 $3,651 Not Implemented
SF0244 # 09 Y:2002 09 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,672 $2,500 Not Implemented
SF0244 # 08 Y:2002 08 2002 REDUCE EXCESSIVE BOILER BLOWDOWN $6,671 $6,000 Implemented
SF0244 # 07 Y:2002 07 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,274 $17,580 Implemented
SF0244 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,304 $4,110 Implemented
SF0244 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $2,185 $1,200 Not Implemented
SF0244 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $31,494 $16,627 Implemented
SF0244 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,936 $19,350 Not Implemented
SF0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $107,810 $50,000 Implemented
SF0244 # 01 Y:2002 01 2002 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $31,136 $7,960 Not Implemented
SF0244 # 15 Y:2002 15 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $72,375 $160,000 Not Implemented
SF0244 # 16 Y:2002 16 2002 $101,519 $350,000 Implemented
SF0244 # 10 Y:2002 10 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $319 $393 Not Implemented
SF0244 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,487 $14,055 Not Implemented
SF0244 # 13 Y:2002 13 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,739 $0 Not Implemented
SF0244 # 12 Y:2002 12 2002 TREAT AND REUSE RINSE WATERS $218,183 $18,705 n/a
LM0036 # 07 Y:2002 07 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,505 $21,928 Not Implemented
LM0036 # 08 Y:2002 08 2002 $101,250 $15,800 Implemented
LM0036 # 09 Y:2002 09 2002 $145,152 $2,000 Not Implemented
LM0036 # 10 Y:2002 10 2002 $202,078 $453,275 Not Implemented
LM0036 # 11 Y:2002 11 2002 $199,710 $14,000 Implemented
LM0036 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,928 $23,600 Not Implemented
LM0036 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,342 $4,800 Implemented
LM0036 # 04 Y:2002 04 2002 UPGRADE CONTROLS ON COMPRESSORS $19,570 $300 Not Implemented
LM0036 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,227 $1,335 Implemented