IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0398 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $4,412 $0 Implemented
SD0432 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,373 $8,285 Not Implemented
SD0432 # 06 Y:2011 06 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,408 $8,000 Not Implemented
SD0432 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $204 $427 Implemented
SD0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,412 $800 Not Implemented
SD0432 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,239 $0 Implemented
SD0432 # 02 Y:2011 02 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,059 $800 Implemented
SD0432 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $100 Not Implemented
SD0416 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,893 $5,295 Implemented
SD0416 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $3,458 $4,950 Implemented
SD0416 # 04 Y:2009 04 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,586 $26,000 Not Implemented
SD0416 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,133 $35,628 Implemented
SD0416 # 05 Y:2009 05 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $655 $0 Implemented
SD0416 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $0 Implemented
SD0409 # 01 Y:2008 01 2008 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $36,255 $192,000 Not Implemented
SD0409 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,543 $8,540 Not Implemented
SD0409 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,066 $6,344 Implemented
SD0409 # 06 Y:2008 06 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,067 $183 Implemented
SD0409 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,387 $2,539 Implemented
SD0409 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $6,590 Implemented
SF0361 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,413 $4,592 Implemented
SF0361 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $6,816 $0 Implemented
SF0361 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $0 Implemented
SF0361 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,199 $713 Implemented
SF0361 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,039 $1,502 Not Implemented