IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0401 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,621 $39,987 Not Implemented
SF0401 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,415 $25,369 Not Implemented
SF0401 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $443 $1,057 Not Implemented
SF0401 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,392 $2,205 Not Implemented
SF0401 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,009 $11,288 Not Implemented
SF0401 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,247 $790 Not Implemented
SF0401 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,739 $5,292 Not Implemented
SF0401 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,461 $0 Not Implemented
SD0435 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,875 $700 Implemented
SD0435 # 06 Y:2011 06 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $866 $840 Implemented
SD0435 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,282 $1,000 Implemented
SD0435 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,988 $4,310 Implemented
SD0435 # 03 Y:2011 03 2011 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $14,990 $3,784 Not Implemented
SD0435 # 01 Y:2011 01 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $704 $0 Implemented
SF0395 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $6,724 $0 Implemented
SF0395 # 12 Y:2011 12 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $96,436 $3,735,000 Not Implemented
SF0395 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,959 $41,361 Not Implemented
SF0395 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,772 $18,000 Implemented
SF0395 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $8,140 $22,037 Implemented
SF0395 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,218 $6,195 Not Implemented
SF0395 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,112 $6,182 Implemented
SF0395 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $1,038 $1,467 Implemented
SF0395 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,833 $5,753 Implemented
SF0395 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,313 $7,243 Implemented
SF0395 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,795 $4,576 Not Implemented