IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0223 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,521 $3,930 Implemented
SD0223 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,581 $7,800 Not Implemented
SD0223 # 08 Y:1999 08 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $118,672 $67,000 Not Implemented
SD0223 # 07 Y:1999 07 1999 $43,030 $54,952 Not Implemented
SD0223 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,900 $9,000 Not Implemented
SD0223 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,800 $0 Implemented
SD0223 # 04 Y:1999 04 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,647 $45,000 Not Implemented
SD0223 # 03 Y:1999 03 1999 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $73,012 $62,000 Not Implemented
SF0164 # 11 Y:1999 11 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,780 $8,175 Not Implemented
SF0164 # 10 Y:1999 10 1999 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $2,233 $0 Not Implemented
SF0164 # 09 Y:1999 09 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $631 $2,500 Not Implemented
SF0164 # 08 Y:1999 08 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,899 $6,500 Not Implemented
SF0164 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,244 $4,080 Not Implemented
SF0164 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,717 $2,424 Not Implemented
SF0164 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,137 $4,800 Not Implemented
SF0164 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,384 $981 Not Implemented
SF0164 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $1,460 $896 Not Implemented
SF0164 # 02 Y:1999 02 1999 REPAIR AND ELIMINATE STEAM LEAKS $278 $125 Not Implemented
SF0164 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,886 $1,618 Not Implemented
SF0164 # 12 Y:1999 12 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $994 $371 Not Implemented
SF0164 # 13 Y:1999 13 1999 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $14,632 $53,728 Not Implemented
SF0156 # 06 Y:1999 06 1999 $11,629 $15,500 n/a
SF0156 # 05 Y:1999 05 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $9,385 $250 n/a
SF0156 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $815 $1,628 n/a
SF0156 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $553 $881 n/a