IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0442 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $597 $1,566 Not Implemented
SD0442 # 05 Y:2011 05 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,760 $26,500 Not Implemented
SD0442 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,022 $1,900 Not Implemented
SD0442 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $247 $30 Not Implemented
SD0442 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,100 $100 Not Implemented
SD0442 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $727 $100 Not Implemented
SD0440 # 01 Y:2011 01 2011 ADD AREA LIGHTING SWITCHES $157 $100 Not Implemented
SD0440 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,302 $3,800 Not Implemented
SD0440 # 04 Y:2011 04 2011 INSTALL SKYLIGHTS $8,840 $24,421 Not Implemented
SD0440 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,205 $24,995 Not Implemented
SD0440 # 02 Y:2011 02 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,314 $1,156 Not Implemented
SD0505 # 05 Y:2011 05 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,773 $17,794 Not Implemented
SD0505 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,230 $18,098 Not Implemented
SD0505 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,899 $10,561 Not Implemented
SD0505 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,022 $2,400 Implemented
SD0505 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,430 $0 Not Implemented
SD0431 # 01 Y:2011 01 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $213 $0 Not Implemented
SD0431 # 05 Y:2011 05 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,310 $10,000 Not Implemented
SD0431 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $817 $2,000 Not Implemented
SD0431 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $89 $98 Not Implemented
SD0431 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,286 $500 Implemented