Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0006 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,728 | $6,000 | n/a |
CI0006 # 05 Y:2022 | 05 | 2022 | REPLACE BOILER | $13,563 | $27,000 | n/a |
CI0006 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,588 | $1,342 | n/a |
CI0006 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,279 | $500 | n/a |
CI0006 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,859 | $82,655 | n/a |
CI0006 # 02 Y:2022 | 02 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $26,391 | $90,000 | n/a |
CI0006 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $28,328 | $32,800 | n/a |
CI0005 # 10 Y:2022 | 10 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $323 | $0 | n/a |
CI0005 # 09 Y:2022 | 09 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $563 | $500 | n/a |
CI0005 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,446 | $0 | n/a |
CI0005 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,483 | $99 | n/a |
CI0005 # 06 Y:2022 | 06 | 2022 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $2,348 | $8,100 | n/a |
CI0005 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,625 | $13,372 | n/a |
CI0005 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,840 | $300 | n/a |
CI0005 # 03 Y:2022 | 03 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,639 | $30,000 | n/a |
CI0005 # 02 Y:2022 | 02 | 2022 | REPLACE BOILER | $15,803 | $9,000 | n/a |
CI0005 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,200 | $16,400 | n/a |
CI0002 # 09 Y:2022 | 09 | 2022 | USE PHOTOCELL CONTROLS | $1,322 | $1,350 | n/a |
CI0002 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,717 | $2,625 | n/a |
CI0002 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,733 | $2,167 | n/a |
CI0002 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,680 | $0 | n/a |
CI0002 # 05 Y:2022 | 05 | 2022 | UPGRADE CONVEYORS | $3,825 | $8,040 | n/a |
CI0002 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,649 | $30,000 | n/a |
CI0002 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,201 | $1,800 | n/a |
CI0002 # 02 Y:2022 | 02 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $27,300 | $24,600 | n/a |