Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0225 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,820 | $0 | Implemented |
SD0225 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,845 | $240 | Implemented |
SD0225 # 04 Y:1999 | 04 | 1999 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $704 | $400 | Implemented |
SD0225 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,087 | $0 | Implemented |
SD0225 # 02 Y:1999 | 02 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,812 | $3,000 | Not Implemented |
SD0225 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,757 | $13,042 | Implemented |
SF0166 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,970 | $11,700 | Not Implemented |
SF0166 # 02 Y:1999 | 02 | 1999 | INSTALL SET-BACK TIMERS | $1,497 | $510 | Not Implemented |
SF0166 # 01 Y:1999 | 01 | 1999 | UPGRADE CONTROLS ON COMPRESSORS | $9,418 | $350 | Not Implemented |
SF0166 # 04 Y:1999 | 04 | 1999 | $1,395 | $3,000 | Not Implemented | |
SD0215 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,300 | $7,000 | Not Implemented |
SF0161 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,081 | $8,340 | Not Implemented |
SF0161 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,053 | $1,408 | Not Implemented |
SF0161 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,859 | $1,055 | Not Implemented |
SF0161 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $834 | $389 | Not Implemented |
SD0215 # 08 Y:1999 | 08 | 1999 | $507,180 | $5,000 | Not Implemented | |
SD0215 # 07 Y:1999 | 07 | 1999 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $13,012 | $0 | Not Implemented |
SD0215 # 05 Y:1999 | 05 | 1999 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $1,153 | $3,000 | Not Implemented |
SD0215 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $2,763 | $1,600 | Not Implemented |
SD0215 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $1,080 | $906 | Not Implemented |
SD0215 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,635 | $6,257 | Implemented |
SD0215 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,652 | $3,480 | Not Implemented |
SD0214 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,832 | $1,000 | Implemented |
SD0214 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $800 | $0 | Implemented |
SD0214 # 03 Y:1999 | 03 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,874 | $1,100 | Not Implemented |