IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0013 # 08 Y:2001 08 2001 $16,434 $0 Implemented
LM0013 # 07 Y:2001 07 2001 $43,680 $5,000 Implemented
LM0013 # 06 Y:2001 06 2001 $19,656 $319 Implemented
LM0013 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,776 $300 Implemented
LM0013 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,040 $1,050 Implemented
LM0013 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $0 Implemented
LM0013 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $3,232 $4,900 Not Implemented
LM0013 # 04 Y:2001 04 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $1,152 $1,165 Not Implemented
SD0282 # 04 Y:2001 04 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,804 $3,550 Implemented
SD0282 # 11 Y:2001 11 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,832,890 $1,400,000 Not Implemented
SD0282 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,312 $2,000 Not Implemented
SD0282 # 06 Y:2001 06 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $33,122 $55,000 Not Implemented
SD0282 # 07 Y:2001 07 2001 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $55,555 $10,000 Implemented
SD0282 # 08 Y:2001 08 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $83,687 $110,000 Not Implemented
SD0282 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,108 $8,000 Not Implemented
SD0282 # 10 Y:2001 10 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $348,473 $150,000 Not Implemented
SD0282 # 14 Y:2001 14 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,925 $1,500 Not Implemented
SD0282 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $103,026 $8,000 Implemented
SD0282 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $5,953 $190 Implemented
SD0282 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,980,189 $2,980,189 Not Implemented
SD0282 # 12 Y:2001 12 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,600 $500 Not Implemented
SD0282 # 16 Y:2001 16 2001 $3,022,214 $480,000 Not Implemented
SD0282 # 13 Y:2001 13 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $21,020 $20,000 Not Implemented
SD0282 # 15 Y:2001 15 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $13,681 $3,000 Not Implemented
SD0282 # 17 Y:2001 17 2001 $1,777 $0 Implemented