IAC logo
IAC Assessment: LM0013
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0013
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product fiberglass
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 113,668
Annual Production 50,000 Pieces
Production Hrs. Annual 2,520
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,936 1,312,400 kWh $0.08
Electricity Demand $67,227 10,485 kW-months/year $6.41
Electricity Fees $24,001 - $ -
Natural Gas $60,280 6,913 MMBtu $8.72
TOTAL ENERGY COSTS $252,444
RECOMMENDED SAVINGS* $128,787 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $124,403
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,040
Cost:
$1,050
$16,420 124,816 $5,400 616 $(-780) - - - $16,420
124,816
kWh
$5,400
616
kW-months/year
$(-780)
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,817
Cost:
-
$1,055 8,016 $762 86 - - - - $1,055
8,016
kWh
$762
86
kW-months/year
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$3,232
Cost:
$4,900
$2,352 17,876 $880 101 - - - - $2,352
17,876
kWh
$880
101
kW-months/year
-
-
$
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,152
Cost:
$1,165
$971 7,384 $181 20 - - - - $971
7,384
kWh
$181
20
kW-months/year
-
-
$
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,776
Cost:
$300
- - - - - - $21,776 - -
-
kWh
-
-
kW-months/year
-
-
$
$21,776
-
$
06: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$19,656
Cost:
$319
- - - - $19,656 - - - -
-
kWh
-
-
kW-months/year
$19,656
-
$
-
-
$
07: 4.426 MODIFY WORKLOAD Savings:
$43,680
Cost:
$5,000
- - - - $43,680 - - - -
-
kWh
-
-
kW-months/year
$43,680
-
$
-
-
$
08: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$16,434
Cost:
-
- - - - $16,434 - - - -
-
kWh
-
-
kW-months/year
$16,434
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$128,787
Cost:
$12,734
$20,798 158,092 $7,223 823 $78,990 - $21,776 - $20,798
158,092
kWh
$7,223
823
kW-months/year
$78,990
-
$
$21,776
-
$
TOTAL IMPLEMENTED Savings:
$124,403
Cost:
$6,669
$17,475 132,832 $6,162 702 $78,990 - $21,776 - $17,475
132,832
kWh
$6,162
702
kW-months/year
$78,990
-
$
$21,776
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes