Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
581
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0273 # 11 Y:2003 | 11 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,386 | $1,395 | Not Implemented |
SF0273 # 15 Y:2003 | 15 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $810 | $0 | Not Implemented |
SF0273 # 13 Y:2003 | 13 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $26,475 | $72,000 | Not Implemented |
SF0273 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,656 | $480 | Implemented |
SF0273 # 14 Y:2003 | 14 | 2003 | INSTALL OCCUPANCY SENSORS | $3,232 | $17,400 | Implemented |
SF0273 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $36,828 | $60,000 | Not Implemented |
SF0273 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,765 | $300 | Implemented |
SF0273 # 07 Y:2003 | 07 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $946 | $1,286 | Not Implemented |
SF0273 # 10 Y:2003 | 10 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,103 | $13,336 | Implemented |
SF0273 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $728 | $728 | Implemented |
SF0273 # 16 Y:2003 | 16 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $7,467 | $6,400 | Not Implemented |
SF0273 # 12 Y:2003 | 12 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,355 | $84,428 | Implemented |
SF0273 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,380 | $8,846 | Not Implemented |
SF0273 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,201 | $7,700 | Not Implemented |
SF0273 # 09 Y:2003 | 09 | 2003 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,493 | $15,750 | Not Implemented |
SF0273 # 17 Y:2003 | 17 | 2003 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $6,279 | $6,714 | Not Implemented |
SF0273 # 04 Y:2003 | 04 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,094 | $76,555 | Not Implemented |
SF0272 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,425 | $190 | Not Implemented |
SF0272 # 06 Y:2003 | 06 | 2003 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,079 | $812 | Not Implemented |
SF0272 # 04 Y:2003 | 04 | 2003 | USE PHOTOCELL CONTROLS | $4,362 | $2,280 | Not Implemented |
SF0272 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,993 | $20,000 | Not Implemented |
SF0272 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,205 | $0 | Implemented |
SF0272 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $521 | $1,231 | Not Implemented |
SF0272 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $542 | $0 | Implemented |
SF0271 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $142,307 | $525,000 | Not Implemented |