IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0458 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,859 $840 Implemented
SF0458 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $1,384 Implemented
SF0458 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,813 $30,411 Not Implemented
SF0458 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,683 $6,142 Not Implemented
SF0458 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,360 $37,774 Not Implemented
SF0458 # 08 Y:2014 08 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,900 $0 Implemented
SF0458 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,195 $0 Not Implemented
SF0458 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,339 $0 Implemented
SF0458 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,582 $522 Implemented
SF0457 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,420 $21,352 Implemented
SF0457 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $4,973 $3,386 Implemented
SF0457 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $898 Implemented
SF0457 # 08 Y:2014 08 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $91,174 $463,974 Not Implemented
SF0457 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,158 $180 Not Implemented
SF0457 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,640 $4,356 Not Implemented
SF0457 # 06 Y:2014 06 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $270 $597 Not Implemented
SF0457 # 02 Y:2014 02 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,323 $0 Not Implemented
SF0455 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $5,163 $31,786 Implemented
SF0455 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,078 $103,067 Implemented
SF0455 # 14 Y:2014 14 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,061 $12,152 Implemented
SF0455 # 09 Y:2014 09 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,364 $21,937 Implemented
SF0455 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,651 $2,966 Implemented
SF0455 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $638 $280 Implemented
SF0455 # 02 Y:2014 02 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $94,396 $0 Implemented
SF0455 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $11,569 Implemented