IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0531 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,404 $82,459 Not Implemented
SF0531 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,968 $3,477 Not Implemented
SF0531 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $88,691 $23,292 Not Implemented
SF0531 # 05 Y:2018 05 2018 INSTALL STEAM TRAP $9,614 $6,613 Not Implemented
SF0531 # 08 Y:2018 08 2018 REPAIR AND ELIMINATE STEAM LEAKS $18,580 $32,000 Not Implemented
SF0531 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,498 $886 Not Implemented
SF0531 # 06 Y:2018 06 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $20,839 $15,682 Not Implemented
SF0531 # 09 Y:2018 09 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $15,854 $35,361 Not Implemented
SF0531 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,894 $0 Not Implemented
SF0530 # 02 Y:2018 02 2018 UPGRADE CONTROLS ON COMPRESSORS $13,070 $22,633 Implemented
SF0530 # 04 Y:2018 04 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,255 $11,220 Implemented
SF0530 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $209 $564 Implemented
SF0530 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,808 $97,552 Implemented
SF0530 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,120 $58,070 Implemented
SF0530 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $6,177 $2,407 Implemented
SF0530 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $97,224 $532,260 Not Implemented
SF0530 # 05 Y:2018 05 2018 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,743 $4,357 Implemented
SF0529 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,136 $1,467 Implemented
SF0529 # 04 Y:2018 04 2018 INSULATE BARE EQUIPMENT $631 $1,040 Implemented
SF0529 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,163 $17,090 Implemented
SF0529 # 05 Y:2018 05 2018 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,200 $13,166 Implemented
SF0529 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $283 $150 Implemented
SD0573 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $14,519 $67,626 Implemented
SD0573 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,330 $10,000 Implemented
SD0573 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,784 $5,838 Implemented