Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0590 # 01 Y:2019 | 01 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $12,001 | $8,840 | Not Implemented |
SD0590 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $319 | $585 | Implemented |
SD0590 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,948 | $0 | Implemented |
SD0590 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $880 | $120 | Implemented |
SF0548 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,653 | $1,103 | Implemented |
SF0548 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,047 | $2,930 | Implemented |
SF0548 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,764 | $0 | Implemented |
SF0548 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $473 | $100 | Implemented |
SF0548 # 07 Y:2019 | 07 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $39,924 | $172,115 | Implemented |
SF0548 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,363 | $300 | Implemented |
SF0548 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $193 | $0 | Implemented |
SF0547 # 05 Y:2019 | 05 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $40,841 | $4,800 | Not Implemented |
SF0547 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,127 | $1,647 | Implemented |
SF0547 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $3,114 | $6,574 | Implemented |
SF0547 # 10 Y:2019 | 10 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $120,071 | $1,107,885 | Not Implemented |
SF0547 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,069 | $7,542 | Not Implemented |
SF0547 # 08 Y:2019 | 08 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $17,743 | $33,601 | Implemented |
SF0547 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,962 | $360 | Implemented |
SF0547 # 04 Y:2019 | 04 | 2019 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $8,499 | $960 | Not Implemented |
SF0547 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,284 | $0 | Implemented |
SF0547 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,625 | $240 | Implemented |
SF0546 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,375 | $542 | Implemented |
SF0546 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,228 | $705 | Not Implemented |
SF0546 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,458 | $28,920 | Not Implemented |
SD0589 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,426 | $8,840 | Implemented |