Search recommendations based on selected criteria.
RESET

4,690

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
UU0147 # 07 Y:2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $400
UU0147 # 06 Y:2019 TURN OFF EQUIPMENT WHEN NOT IN USE $130 $0
UU0147 # 03 Y:2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $7,000
UU0147 # 04 Y:2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,746 $1,200
UU0147 # 05 Y:2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,081 $1,800
UU0147 # 01 Y:2019 USE A RECYCLED RAW MATERIAL $54,000 $300,000
UU0147 # 02 Y:2019 USE OPTIMUM THICKNESS INSULATION $3,521 $2,917
UU0146 # 10 Y:2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,482 $1,000
UU0146 # 09 Y:2019 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $97 $75
UU0146 # 08 Y:2019 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $231 $1,100
UU0146 # 06 Y:2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $693 $2,575
UU0146 # 07 Y:2019 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $367 $1,200
UU0146 # 05 Y:2019 INSTALL / REPAIR INSULATION ON STEAM LINES $850 $0
UU0146 # 04 Y:2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $350
UU0146 # 02 Y:2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,186 $2,000
Back to Top