IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0278 # 10 Y:1993 10 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,520 $4,500 Not Implemented
CO0278 # 09 Y:1993 09 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,040 $6,200 Not Implemented
CO0278 # 08 Y:1993 08 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,350 $8,080 Not Implemented
CO0278 # 07 Y:1993 07 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $520 $750 Implemented
CO0278 # 06 Y:1993 06 1993 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,120 $8,160 Implemented
CO0278 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $250 Implemented
CO0049 # 03 Y:1985 03 1985 INSTALL TURBULATORS $1,131 $1,000 Not Implemented
CO0049 # 04 Y:1985 04 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,411 $4,000 Implemented
CO0049 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,347 $200 Implemented
CO0049 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $296 $250 Implemented
CO0049 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,488 $300 Implemented
CO0049 # 07 Y:1985 07 1985 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,828 $2,800 Implemented
CO0049 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,647 $20,000 Implemented
CO0049 # 09 Y:1985 09 1985 IMPROVE LUBRICATION PRACTICES $379 $100 Implemented
CO0049 # 10 Y:1985 10 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,284 $2,039 Not Implemented
CO0049 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $614 $1,050 Implemented
CO0049 # 11 Y:1985 11 1985 USE UTILITY CONTROLLED POWER MANAGEMENT $16,714 $25,000 Not Implemented
CO0027 # 06 Y:1985 06 1985 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $1,928 $750 Implemented
CO0027 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $843 $1,200 Not Implemented
CO0027 # 04 Y:1985 04 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $698 $200 Implemented
CO0027 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $100 Implemented
CO0027 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $150 Implemented
CO0027 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,811 $219 Implemented