IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

343

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1013 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $10,211 $116,226 n/a
CM1013 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $465 $260 n/a
CM1013 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $3,590 n/a
CM1013 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,342 $3,480 n/a
CO0719 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,840 $3,490 Not Implemented
CO0719 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,060 $50,310 Not Implemented
CO0719 # 03 Y:2016 03 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,380 $48,350 Not Implemented
CO0700 # 04 Y:2015 04 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,840 $15,500 Not Implemented
CO0700 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $4,710 $0 Not Implemented
CO0700 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,950 $82,280 Not Implemented
CO0700 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $1,270 Implemented
CO0700 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $540 $1,820 Not Implemented
CO0676 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,190 $3,000 Implemented
CO0676 # 05 Y:2013 05 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,840 $500 Implemented
CO0676 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,670 $2,740 Not Implemented
CO0676 # 03 Y:2013 03 2013 REPAIR AND ELIMINATE STEAM LEAKS $730 $900 Implemented
CO0676 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,020 $250 Implemented
CO0649 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $12,260 $3,200 Not Implemented
CO0649 # 08 Y:2011 08 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,150 $60 Not Implemented
CO0649 # 07 Y:2011 07 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,770 $60 Not Implemented
CO0649 # 06 Y:2011 06 2011 REDUCE VENTILATION AIR $3,200 $60 Not Implemented
CO0649 # 05 Y:2011 05 2011 INSTALL SKYLIGHTS $38,050 $70,550 Not Implemented
CO0649 # 04 Y:2011 04 2011 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,270 $3,910 Not Implemented
CO0649 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,610 $480 Not Implemented
CO0649 # 02 Y:2011 02 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,530 $20,000 Not Implemented