Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0452 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $350 | $0 | n/a |
CO0452 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $0 | n/a |
CO0452 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $290 | n/a |
CO0452 # 06 Y:1999 | 06 | 1999 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $140 | $0 | n/a |
CO0452 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $130 | $0 | n/a |
CO0452 # 02 Y:1999 | 02 | 1999 | REDUCE VENTILATION AIR | $1,860 | $1,000 | n/a |
CO0452 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,650 | $5,000 | n/a |
CO0449 # 07 Y:1999 | 07 | 1999 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $2,550 | $1,100 | Implemented |
CO0449 # 08 Y:1999 | 08 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,160 | $3,300 | Implemented |
CO0449 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60 | $0 | Implemented |
CO0450 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,800 | $15,000 | Implemented |
CO0449 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,410 | $66,360 | Implemented |
CO0449 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $280 | Implemented |
CO0449 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $18,110 | $3,600 | Implemented |
CO0449 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $8,960 | $620 | Implemented |
CO0449 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,830 | $10,000 | Implemented |
CO0450 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,280 | $60,960 | Not Implemented |
CO0449 # 03 Y:1999 | 03 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,030 | $500 | Not Implemented |
CO0450 # 03 Y:1999 | 03 | 1999 | PURCHASE APPROPRIATELY SIZED MATERIAL | $1,580 | $0 | Not Implemented |
CO0448 # 08 Y:1999 | 08 | 1999 | DEVELOP STANDARD OPERATING PROCEDURES | $36,000 | $0 | n/a |
CO0448 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $30 | n/a |
CO0448 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20 | $0 | n/a |
CO0448 # 04 Y:1999 | 04 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $380 | $150 | n/a |
CO0448 # 07 Y:1999 | 07 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $160,300 | $489,000 | n/a |
CO0448 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $210 | n/a |