ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0452 # 05 Y:1999 | 05 | 1999 | USE A RAG RECYCLE SERVICE | $350 | $0 | n/a |
CO0452 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $0 | n/a |
CO0452 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $290 | n/a |
CO0452 # 06 Y:1999 | 06 | 1999 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $140 | $0 | n/a |
CO0452 # 07 Y:1999 | 07 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $130 | $0 | n/a |
CO0452 # 02 Y:1999 | 02 | 1999 | REDUCE VENTILATION AIR | $1,860 | $1,000 | n/a |
CO0452 # 01 Y:1999 | 01 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,650 | $5,000 | n/a |
CO0449 # 07 Y:1999 | 07 | 1999 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $2,550 | $1,100 | Implemented |
CO0449 # 08 Y:1999 | 08 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,160 | $3,300 | Implemented |
CO0449 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60 | $0 | Implemented |
CO0450 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,800 | $15,000 | Implemented |
CO0449 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,410 | $66,360 | Implemented |
CO0449 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $700 | $280 | Implemented |
CO0449 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $18,110 | $3,600 | Implemented |
CO0449 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $8,960 | $620 | Implemented |
CO0449 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,830 | $10,000 | Implemented |
CO0450 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,280 | $60,960 | Not Implemented |
CO0449 # 03 Y:1999 | 03 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $3,030 | $500 | Not Implemented |
CO0450 # 03 Y:1999 | 03 | 1999 | PURCHASE APPROPRIATELY SIZED MATERIAL | $1,580 | $0 | Not Implemented |
CO0448 # 08 Y:1999 | 08 | 1999 | DEVELOP STANDARD OPERATING PROCEDURES | $36,000 | $0 | n/a |
CO0448 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $430 | $30 | n/a |
CO0448 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20 | $0 | n/a |
CO0448 # 04 Y:1999 | 04 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $380 | $150 | n/a |
CO0448 # 07 Y:1999 | 07 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $160,300 | $489,000 | n/a |
CO0448 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $210 | n/a |