Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0651 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $18,774 | $1,000 | Not Implemented |
MA0651 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,340 | $96,800 | Implemented |
MA0651 # 03 Y:2009 | 03 | 2009 | REPLACE BOILER | $10,080 | $30,700 | Implemented |
MA0651 # 04 Y:2009 | 04 | 2009 | COVER OPEN TANKS | $10,013 | $5,866 | Not Implemented |
MA0651 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,941 | $3,219 | Not Implemented |
MA0651 # 06 Y:2009 | 06 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,725 | $18,300 | Not Implemented |
MA0650 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,218 | $10,000 | Not Implemented |
MA0650 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,735 | $0 | Implemented |
MA0650 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $581 | $2,300 | Implemented |
MA0650 # 04 Y:2009 | 04 | 2009 | REDUCE VENTILATION AIR | $250 | $0 | Implemented |
MA0650 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $213 | $0 | Implemented |
MA0646 # 01 Y:2009 | 01 | 2009 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $7,158 | $8,683 | Not Implemented |
MA0646 # 02 Y:2009 | 02 | 2009 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $5,780 | $0 | Implemented |
MA0646 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,968 | $3,610 | Not Implemented |
MA0646 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,508 | $300 | Implemented |
MA0646 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,450 | $5,195 | Not Implemented |