IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0098 # 01 Y:2012 01 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $92,987 $22,000 Implemented
DL0092 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $50,827 $48,000 Not Implemented
DL0092 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,100 $25,000 Not Implemented
DL0092 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $12,700 $28,000 Not Implemented
DL0082 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $64,179 $280,000 Not Implemented
DL0082 # 02 Y:2012 02 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $18,536 $46,000 Not Implemented
DL0082 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $1,330 Implemented
DL0082 # 04 Y:2012 04 2012 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $716 $90 Implemented
DL0082 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,636 $2,100 Not Implemented
DL0076 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,650 $24,000 Not Implemented
DL0076 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $63,000 $100 Implemented
DL0076 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,900 $380,000 Not Implemented
DL0076 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,500 $4,000 Implemented
DL0062 # 07 Y:2010 07 2010 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,500 $1,000 Not Implemented
DL0062 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,900 $30 Implemented
DL0062 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $649 $1,331 Not Implemented
DL0062 # 10 Y:2010 10 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,200 $2,500 Not Implemented
DL0062 # 11 Y:2010 11 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,800 $10,000 Not Implemented
DL0062 # 12 Y:2010 12 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,700 $10,000 Not Implemented
DL0062 # 13 Y:2010 13 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $233 $970 Not Implemented
DL0062 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,400 $15,300 Not Implemented
DL0062 # 01 Y:2010 01 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,000 $2,500 Not Implemented
DL0062 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,000 $15,930 Not Implemented
DL0062 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,200 $10,000 Not Implemented
DL0062 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $5,000 Implemented