IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0062 # 11 Y:2010 11 2010 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,800 $10,000 Not Implemented
DL0062 # 10 Y:2010 10 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,200 $2,500 Not Implemented
DL0062 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $649 $1,331 Not Implemented
DL0062 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,900 $30 Implemented
DL0062 # 07 Y:2010 07 2010 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,500 $1,000 Not Implemented
DL0062 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $5,000 Implemented
DL0062 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,400 $15,300 Not Implemented
DL0062 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,200 $10,000 Not Implemented
DL0062 # 13 Y:2010 13 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $233 $970 Not Implemented
DL0062 # 03 Y:2010 03 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,000 $6,300 Not Implemented
DL0062 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,000 $15,930 Not Implemented
DL0062 # 01 Y:2010 01 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,000 $2,500 Not Implemented
DL0062 # 12 Y:2010 12 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,700 $10,000 Not Implemented
DL0049 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51,500 $30,000 Implemented
DL0049 # 02 Y:2010 02 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $35,889 $1,500 Implemented
DL0049 # 08 Y:2010 08 2010 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $190 $435 Not Implemented
DL0049 # 04 Y:2010 04 2010 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,180 $1,000 Implemented
DL0049 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,857 $2,180 Not Implemented
DL0049 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,599 $50 Not Implemented
DL0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,192 $2,000 Implemented
DL0049 # 05 Y:2010 05 2010 REPAIR OR REPLACE STEAM TRAPS $17,413 $2,500 Implemented
DL0053 # 13 Y:2010 13 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,600 $100 Implemented
DL0053 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,100 $500 Not Implemented
DL0053 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,000 $700 Implemented
DL0053 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $80,000 $30,000 Implemented