Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
206
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0164 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,513 | $59,950 | Implemented |
DL0164 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,095 | $32,300 | Not Implemented |
DL0164 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,804 | $11,335 | Not Implemented |
DL0164 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,606 | $16,930 | Not Implemented |
DL0164 # 06 Y:2016 | 06 | 2016 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $319,299 | $522,826 | Not Implemented |
DL0164 # 01 Y:2016 | 01 | 2016 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $109,877 | $5,990 | Not Implemented |
DL0158 # 05 Y:2016 | 05 | 2016 | REDUCE HEAT GAIN BY WINDOW TINTING | $54,090 | $104,500 | Implemented |
DL0158 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,070 | $380,000 | Implemented |
DL0158 # 08 Y:2016 | 08 | 2016 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,534 | $96,100 | Implemented |
DL0158 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $86,560 | $331,000 | Not Implemented |
DL0158 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,940 | $1,480 | Not Implemented |
DL0158 # 04 Y:2016 | 04 | 2016 | UPGRADE OBSOLETE EQUIPMENT | $13,830 | $11,600 | Not Implemented |
DL0158 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,270 | $60 | Not Implemented |
DL0158 # 02 Y:2016 | 02 | 2016 | REDUCE VENTILATION AIR | $310,823 | $38,750 | Implemented |
DL0134 # 03 Y:2014 | 03 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,580 | $0 | Implemented |
DL0134 # 08 Y:2014 | 08 | 2014 | METER WASTE WATER | $8,610 | $8,200 | Implemented |
DL0134 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,000 | $33,600 | Implemented |
DL0134 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $41,430 | $54,000 | Implemented |
DL0134 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,090 | $10,500 | Not Implemented |
DL0134 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,200 | $13,590 | Not Implemented |
DL0134 # 05 Y:2014 | 05 | 2014 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $54,210 | $28,110 | Not Implemented |
DL0134 # 04 Y:2014 | 04 | 2014 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $4,630 | $5,700 | Not Implemented |
DL0128 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $18,200 | $12,560 | Implemented |
DL0128 # 05 Y:2014 | 05 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,000 | $20,000 | Implemented |
DL0128 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,300 | $15,000 | Not Implemented |